solar surge sales PORTAL

Markets Served: AZ, NV

Installation Timeline: 2 - 4 months

Commission Schedule: 30% Design, 70% Install

Standard Equipment: Hanwha Qtron 420W, Enphase IQ8M

Markets Served: AR, AZ, CA, CO, CT, DC, DE, FL,

GA, ID, IL, MA, ME, MD, NV, NH, NJ, NM, NY, NC, OH, OR, PA, RI, SC, TX, UT, VA, VT, WA, WI

Installation Timeline: 2 - 3 months

Commission Schedule: 80% Install, 20% PTO

Standard Equipment: Trina 405W, SolarEdge

Markets Served: AZ, CA, TX

Installation Timeline: 2 - 3 months

Commission Schedule: 30% Design ($1.5k max), 70% Install

Standard Equipment: Missions Solar 395W, Enphase IQ8+

Markets Served: FL, MA, RI

Installation Timeline: 2 - 3 months

Commission Schedule: 100% Install

Standard Equipment: Q-Cell 400W, Enphase IQ8+

Markets Served: CA, NC, VA

Installation Timeline: 4 - 8 weeks

Commission Schedule: 50% Design (Enium), 50% Install

Standard Equipment: Hyundai 400W, Enphase IQ7+

Markets Served: NY

Installation Timeline: 2 - 3 months

Commission Schedule: 100% Install

Standard Equipment: Qcell 365W, Enphase IQ8+

Markets Served: DC, DE, MD, NC, PA, VA, WV

Installation Timeline: 2 - 3 months

Commission Schedule: 100% Install

Standard Equipment: REC 420 Pure R, SolarEdge

Markets Served: TX

Installation Timeline: 2 - 3 months

Commission Schedule: 100% Install

Standard Equipment: SolarEver 410W, SolarEdge

Markets Served: TX

Installation Timeline: 2 - 3 months

Commission Schedule: 30% Design, 70% Install

Standard Equipment: Canadian 395, SolarEdge

Markets Served: FL

Installation Timeline: 2 - 3 months

Commission Schedule: 100% Install

Standard Equipment: Q-Cell 405W or Aptos 440W, Enphase IQ8+

solar surge SALES RESOURCES

Click the buttons below for videos and training resources

Solar Surge, the smarter way to go solar

© Copyright 2023 Solar Surge. All Rights Reserved. Designed by Contractor Growth System.

© Copyright 2022 Solar Surge. All Rights Reserved.